Features
Pricing Blog (FR) Try with your tender
Try with your tender
Tender response platform

Respond to more tenders without hiring

Your team handles 3 out of 5 tenders? With DOAKEN, they handle all of them. From tender document analysis to final submission, everything happens in one single platform. Technical proposal, bill of quantities pricing, administrative documents, market watch.

Trusted by bid teams in construction, energy and services
Proposal 34 pages in 28 min
Pricing 186 lines costed
Export submission-ready ZIP
Technical Proposal Quality score 95%

6.2 Phase 2 — Deep foundations on bored piles

The G2-AVP geotechnical survey identifies a bearing stratum in marl-limestone at 6.50 m below ground level (net limit pressure Pl* = 3.2 MPa, pressuremeter modulus EM = 45 MPa). The superficial layers (clayey silts, Pl* = 0.4 MPa) require deep foundations using bored piles Ø 600 mm, anchored at least 1 m into the bearing substratum.

Geotechnical characteristics — Borehole summary
LayerDepthPl* (MPa)EM (MPa)Type
Topsoil0 – 0.60 mLoose humus
Clayey silts0.60 – 3.80 m0.45.8Plastic clay IL=0.7
Limestone gravel3.80 – 5.50 m1.822Compact gravel
Marl-limestone5.50 – 9.00 m+3.245Bearing stratum
Operating procedure — Continuous flight auger bored piles
1
Setting out and working platform
Pile axis positioning via GPS RTK Trimble R12i (accuracy +/- 2 cm). Platform in compacted aggregate 0/80 at 95% OPM (40 cm thick) for bearing capacity of 40 MPa min. under the rig.
GPS RTK TrimbleAggregate 0/8095% OPM
2
Continuous flight auger drilling
SOILMEC SR-30 rig (torque 120 kN.m) fitted with Ø 630 mm auger. Continuous drilling without extraction. Target depth: 7.50 m below GL (1 m embedment in marl-limestone).
SOILMEC SR-30Ø 630 mmDepth 7.50 m
3
Concreting via tremie pipe
Concrete C30/37 — S5 (max aggregate 20 mm) from certified plant, pumped through central tremie pipe. Theoretical volume per pile: 2.2 m3 — allowable over-pour 20% max.
C30/37 S5Tremie pipeOver-pour 20% max
4
Reinforcement cage and pile trimming
Cage: 6 No. H16 main bars + H8 spirals at 200 mm pitch, length 8.00 m. Pile trimming at D+7 using light hydraulic breaker.
6 H16 + H8Trimming D+7Hydraulic breaker
5
Integrity testing
Integrity testing by mechanical impedance (NF P 94-160) on 100% of piles. Static load testing on 2 trial piles (150% SLS load).
NF P 94-160150% SLS loadHold point
42
Bored piles Ø 600
7.50 m
Embedment depth
92 m3
Foundation concrete
100%
Integrity tested
Pages 18-20 · Written from the specifications, G2 geotechnical report, and company resources
0 min
Full tender document analysis: lots, evaluation criteria, deadlines and documents identified automatically
0 min
Technical proposal ready for review, aligned with evaluation criteria, built on your actual track record
0 000+
Awarded public contracts analysed to benchmark every cost estimate (data.gouv.fr)
0 sources
Automated market watch: BOAMP, TED Europa and Sitadel building permits

From tender documents to submission

The entire process in one platform. Each step feeds into the next automatically.

Your team receives a 200-page consultation file. Today, it takes 3 to 5 days to analyse it, identify the evaluation criteria, write the technical proposal, price the bill of quantities, and assemble the administrative documents. Meanwhile, other tenders pile up with no one available to handle them.

With DOAKEN, that process takes less than half a day. Tender document analysis automatically extracts lots, scoring criteria, and deadlines. The Go/No-Go score tells you within 2 minutes whether the contract is worth the investment. The technical proposal is built section by section, drawing on your own track record, your team CVs, your certifications. No generic content: every sentence is grounded in real data from your company.

Each step feeds the next: criteria extracted from the instructions structure the proposal, specification requirements inform the methodology, your historical prices pre-fill the cost estimate. The result: a complete, coherent package, ready to submit.

app.doaken.fr
Analysis
Go/No-Go
Proposal
Pricing
Export
Tender Analysis — School Rehab, Jean Moulin, Villeurbanne
Analysis complete · 4 min 32s
4
Lots identified
3
Evaluation criteria
15 Apr.
Submission deadline
12
Documents categorised
Technical merit60%
Price30%
Delivery schedule10%
Go/No-Go Score — Lot 3: Structural works
GO · 76/100
76/100
Technical fit
85
Budget alignment
70
Achievable deadlines
90
Estimated competition
55
Available references
80
Technical Proposal — Lot 3 Structural works
Quality score: 95%
1Company profileProfile98%
2Understanding of requirementsSpecs94%
3Similar referencesVault97%
4Execution methodologySpecs93%
5Human and material resourcesITT96%
6Project programmeContract91%
7Environmental approachITT95%
Structural works will be carried out in accordance with DTU 13.12 (foundations) and DTU 20.1 (masonry). The phasing plan respects the partial-occupancy constraints of the site...
Bill of Quantities — Lot 3 Structural works
K = 1.35
DescriptionQtyUnit rateTotal
Earthworks and excavation480 m338.50 EUR24,948 EUR
Reinforced concrete foundations85 m3245.00 EUR28,114 EUR
Loadbearing blockwork620 m252.00 EUR43,502 EUR
RC floor slab 1st floor340 m2125.00 EUR57,375 EUR
Total excl. VAT (K = 1.35)207,818 EUR
Blockwork rate is 14% below market average (data.gouv.fr) — check your margin
Complete submission export
Ready to submit
DC1 — Application letter
DC2 — Candidate capabilities
Technical proposal (PDF)
Priced bill of quantities (Excel)
Company registration, insurance, certificates
Download complete ZIP
1 Analysis5 min
2 Go/No-Goinstant
3 Proposal30 min
4 Pricing15 min
5 Export1 click
Upload tender docs2 min

Drop the ZIP of the consultation file

Analysis5 min

Lots, criteria, deadlines extracted

Go/No-GoInstant

Feasibility score across 5 factors

Technical proposal30 min

Sections tailored to the evaluation criteria

ZIP export1 click

Complete package ready to submit

Every week, contracts slip through the cracks

Your team receives more tenders than it can handle. They triage, respond to the most winnable ones, and drop the rest. Every tender left on the table is revenue going straight to a competitor.

The bottleneck is always the same: writing the technical proposal. It takes 20 to 40 hours per submission, ties up your best people, and accounts for 50 to 70% of the final score. Without additional writing capacity, there is no way to handle more tenders. Hiring a bid manager takes 6 to 12 months, when the profile even exists.

One in two companies misses a contract due to lack of speed. (OECP 2024)

Calculate your missed revenue
School rehabilitation — Villeurbanne1,850,000 EUR excl. VAT · Lot 3 Structural works
Handled
Care home extension — Lyon Metropolis3,200,000 EUR excl. VAT · Single lot all trades
Handled
Energy retrofit, Voltaire secondary school — Dept. 692,400,000 EUR excl. VAT · Lot 2 Building envelope
Dropped
Municipal nursery construction — Caluire980,000 EUR excl. VAT · Lot 1 Structural works
Handled
Sports hall refurbishment — Auvergne-Rhone-Alpes Region1,600,000 EUR excl. VAT · Lots 1-4
Dropped

A complete platform, not a gimmick

From opportunity detection to final submission, every module does the real work. Click on each feature to see exactly how it works.

Automated tender document analysis
Upload your consultation ZIP (instructions, specifications, bill of quantities, drawings, appendices). In 5 minutes, lots are identified, evaluation criteria and their weightings extracted, deadlines detected, every document categorised. No more reading 200 pages to find key information. This analysis structures the entire submission.
See details
4 lots3 criteriaDeadline: 15 April
ITT.pdf · Specs.pdf · BoQ.xlsx · Admin.pdf · Drawings.dwg
Go/No-Go Score
8 weighted criteria analysed from the tender documents: technical fit, budget, deadlines, estimated competition, constraints, references, location, complexity. Score out of 100 with justified recommendation. No more gut-feel decisions: you know within 2 minutes whether the contract is worth 40 hours of work.
See the scoring
Bill of Quantities Pricing
Import the buyer's schedule (PDF or Excel). Import your unit rates, and Doaken benchmarks them against 367,000+ awarded public contracts (data.gouv.fr). Adjustable K coefficient (overheads + contingencies + margin). Automatic alerts when a rate falls below market average. You stay in control of every line; the tool protects you from errors.
See the pricing
Technical Proposal
30 minutes for a complete proposal, aligned with the contract's evaluation criteria. Each section draws on your project references, team CVs, and certifications. DTU standards and Qualibat requirements built in. You review and approve, section by section.
See the generation
Tender Radar: BOAMP + TED Europa + Sitadel
3 sources cross-referenced in real time: BOAMP (French national public contracts), TED Europa (European contracts over 5M EUR), Sitadel building permits (private projects before tenders are published). Filters by region, sector, keywords, budget, deadline. Automatic email alerts. Spot opportunities before your competitors.
See the radar
Document Vault
Centralise company registration, tax and social certificates, professional indemnity, ten-year warranty, Qualibat certifications, team CVs. Automatic alerts 30 days before expiry. Every document is automatically included in your submission packages. Never again submit with an expired or missing document.
See the vault
Automated Tender Document Analysis

Upload your tender documents, everything is extracted automatically

Upload the complete consultation file (ZIP, PDF, Excel). In 5 minutes, the entire package is analysed: lots are identified, evaluation criteria extracted with their weightings, deadlines detected, every document categorised by type.

No more reading 200 pages to find key information. The analysis structures the entire downstream workflow: Go/No-Go score, required documents per lot, technical proposal sections. It is the foundation of your submission.

Drop your tender documents here (ZIP)
PDFRC_GS_Jean_Moulin.pdf
PDFCCTP_Lot3_Gros_Oeuvre.pdf
XLSDPGF_Lot3_GO.xlsx
DWGPlans_Structure_R+1.dwg
4 lots detected 3 evaluation criteria Deadline: 15 April 2026 12 documents categorised 2 variants permitted
Score Go/No-Go

Data-driven decisions, no more guesswork

8 weighted criteria analysed automatically from the tender documents: technical fit, budget, deadlines, estimated competition, constraints, required references, location, complexity. Everything is calculated from the actual documents.

Quantified recommendation with detailed justification. Identify profitable contracts and pitfalls before investing 40 hours of writing. Your teams focus on the submissions that truly matter.

Recommendation: GO
0
Feasibility score
Technical fit
85
Budget alignment
70
Achievable deadlines
90
Available references
60
Technical Proposal

Technical proposal ready in 30 minutes

Each section is built from 5 data sources: the tender document analysis, your similar project references, your team CVs, the regulatory knowledge base (DTU, Eurocodes, ISO) and the specific requirements from the specifications.

The output cites your real projects, your real certifications, your real staff. Quality score for each section. You review, adjust, approve. No generic content: every sentence is grounded in your company's actual data.

Section 4 — Structural works methodology 96%
Bill of Quantities Pricing

Pricing calibrated against the real market

Import the buyer's schedule (PDF or Excel). Import your own unit rates and your K coefficient (overheads + contingencies + margin). Doaken benchmarks each line against data from 367,000+ awarded public contracts (data.gouv.fr). You adjust whatever you want, line by line.

Behind the scenes, your rates are cross-referenced with 367,000+ awarded public contracts (open data from data.gouv.fr). If a line falls below market average, an alert warns you before you submit. Protect your margins.

Lot 3: Structural works
Coef. K:
DescriptionQtyUnit rateTotal
Earthworks and excavation480 m338.50 EUR24,948 EUR
Reinforced concrete foundations85 m3245.00 EUR28,114 EUR
⚠ Loadbearing blockwork620 m252.00 EUR43,502 EUR
RC floor slab 1st floor340 m2125.00 EUR57,375 EUR
Glulam timber structure280 m2185.00 EUR69,930 EUR
Total excl. VAT (K = 1.35)302,223 EUR
Document Vault

Documents centralised, automatic alerts

Centralise all your company documents: registration certificates, tax and social declarations, insurance policies, Qualibat certifications, team CVs. Everything in one place, no more chasing documents scattered across email inboxes.

Automatic alerts 30 days before expiry. Every document is automatically included in your submission packages. Never again submit with an expired or missing certificate.

Company reg.Valid
Company RegistrationExpires 15/09/2026
Auto-included in every submission
Tax certificateValid
Tax certificateExpires 31/12/2026
Tax authority compliant
Social securityExpiring soon
Social security certificateExpires in 13 days
Email alert sent
PI InsuranceValid
Professional Indemnity5,000,000 EUR
AXA — Expires 01/2027
10-year warrantyValid
10-year warrantyAll trades
Auto-included in ZIP export
QualibatMissing
QualibatNot uploaded
Required for 3 tenders
Tender Radar

Three sources, zero blind spots

BOAMP (French national public contracts), TED Europa (European contracts over 5M EUR), Sitadel building permits (private projects). Filters by region, sector, keywords, budget range, deadline.

Automatic email alerts. Detect relevant opportunities before your competitors, including private projects that have not yet appeared in official tender notices. Stay ahead instead of reacting.

BOAMPTED EuropaSitadelRhone-Alpes
Nursery school rehabilitation, Pasteur — Venissieux
Municipality of Venissieux · 69 · Structural lot
3 days
Secondary school extension, Jean Mace — Villefranche
Dept. du Rhone · 69 · All trades
11 days
Community sports hall — CCPO
CC Porte de l'Oisans · 38
24 days
Care home renovation, Les Musiciens — Saint-Priest
Lyon Metropolis · Via TED Europa
32 days

The impact, in numbers

Today
0–40h
With DOAKEN
0 min
per technical proposal
Tailored to evaluation criteria. Built on your references, CVs, certifications, applicable standards and tender document analysis. You review and approve before export.
Before
DOAKEN
Today
Forced triage, tenders dropped
With DOAKEN
All your tenders handled
with the same team
Tenders you used to drop for lack of time become opportunities you actually pursue. No hiring, no outsourcing, no training. Your current team does more, better.
Before
DOAKEN
What is the impact for you?
Calculate in 30 seconds
Enter your tender volume and average contract value. The simulator calculates the additional revenue you could generate with DOAKEN.
Open the simulator

Simulate your potential

Enter your current situation. Results are calculated in real time.

Estimated impact with DOAKEN
Estimated additional revenue
+1.8 M EUR
Tenders that go from "dropped" to "handled"
Additional tenders
+9
Increased response capacity
Commercial time recovered
270h
Reinvested in client relationships and fieldwork
Request a personalised demo

Estimates based on your data and observed industry averages.

Tender analysis in 5 minutes
Automatic Go/No-Go score
Tailored technical proposal
367K+ public contracts benchmarked
BOAMP + TED Europa + Sitadel market watch
Document vault with expiry alerts
Submission-ready ZIP export
Hosted in Europe · GDPR compliant
Tender analysis in 5 minutes
Automatic Go/No-Go score
Tailored technical proposal
367K+ public contracts benchmarked
BOAMP + TED Europa + Sitadel market watch
Document vault with expiry alerts
Submission-ready ZIP export
Hosted in Europe · GDPR compliant

Built for the demands of mid-market and enterprise organisations

Security, support and transparency. What you should expect from a real partner, not just another tool.

Secure European infrastructure
Your submissions, your rates, your margins are stored on servers located in Europe (Frankfurt). End-to-end encryption, multi-factor authentication, full access traceability. GDPR compliant. Your data is never shared or used to train models.
Supabase (AWS eu-central-1) · Cloudflare R2 · AES-256 encryption at rest, TLS 1.3 in transit
Dedicated support
Demo on your actual tender documents. Personalised onboarding with your team. Training included. A single point of contact who knows your industry, not a chatbot. We support you through your first submissions.
Onboarding in 1 week · Team training · Email and video call support · Response within 24h
You stay in control
Every technical proposal, every pricing line is validated by your team before export. The tool proposes, you decide. Your data belongs to you. Unlimited revisions, PDF/DOCX/Excel export.
Section-by-section validation · Unlimited revisions · PDF/DOCX/Excel export · Data deletion on request

Ready to respond to more tenders?

Request a demo on your own tender documents. 30 minutes, no commitment. We show you exactly what DOAKEN produces on one of your real consultation files.

Personalised demo · No commitment · Response within 24h
Request a demo

Try with your tender

Response within 24h · Personalised demo · No commitment